Software for electricity distribution operators

Assurance for every flexible grid-access decision

Flexgy sits on top of your ADMS or DERMS and decides, for every dynamic limit, whether to act, limit or abstain. Every decision leaves an Evidence Passport ready to audit.

Decisions you can defend.

Decision console for a node during a never-seen heatwave: Flexgy abstains and falls back to the physics rule. Illustrative screen with synthetic data.

Selected for Naturgy’s Connecting Energy 2026 incubation programme →

Three answers for every limit

Your engine proposes how much capacity to give. Flexgy decides what to do with that proposal, and why.

ACT

Known state, reliable margin

The calibrated limit is authorised, instead of applying a fixed, conservative margin.

LIMIT

Confidence below threshold

Curtailed to what the calibrated risk allows. Not one megawatt more.

ABSTAIN

The grid is in a never-seen state

Flexgy does not improvise: it falls back to the DSO’s conservative physical rule and writes it down.

Why now

The grid is saturated on paper and flexible access permits are the way out. But they require automated decisions that can be defended.

~40 GW

of access requested in Spain in 2025; only 12 % (4.5 GW) granted

Preliminary Aelec data, via Forbes ↗
83.4 %

of distribution nodes without capacity for new demand

Capacity maps, Sept 2025, via Forbes ↗
1/1/2028

CNMC deadline for Type 2 flexible-access tools

CNMC ↗

How to start

Without touching the grid, and with success and stop criteria agreed before starting.

  1. 2–4 weeks

    Diagnostic

    We review your candidate nodes, engine and data.

  2. 12–16 weeks · 1–3 nodes

    Shadow-mode pilot

    Flexgy decides in parallel with real operations.

  3. Per node or per network

    Licence

    Deployment when the evidence justifies it.

See the pilot programme →Pilot programme with limited places.

Limit only what you must.

Not one megawatt of margin too many, nor one too few. And the proof of every decision.

Monthly newsletter · “Node by node”

Flexible access, the 2028 CNMC deadline and automated decisions, once a month.

First issue: the guide “What the CNMC requires before 2028, on one page”.

See Flexgy running on a case like yours.

Request a demo