Known state, reliable margin
The calibrated limit is authorised, instead of applying a fixed, conservative margin.
Software for electricity distribution operators
Flexgy sits on top of your ADMS or DERMS and decides, for every dynamic limit, whether to act, limit or abstain. Every decision leaves an Evidence Passport ready to audit.
Decisions you can defend.
Selected for Naturgy’s Connecting Energy 2026 incubation programme →
Your engine proposes how much capacity to give. Flexgy decides what to do with that proposal, and why.
The calibrated limit is authorised, instead of applying a fixed, conservative margin.
Curtailed to what the calibrated risk allows. Not one megawatt more.
Flexgy does not improvise: it falls back to the DSO’s conservative physical rule and writes it down.
Each piece, on its own page.
How it sits on top of your grid engine and decides every limit.
View page →The record every decision leaves behind, ready to audit.
View page →Calibrated margin, never-seen states and physics fallback.
View page →Inputs, outputs, deployment, data and shadow mode.
View page →The grid is saturated on paper and flexible access permits are the way out. But they require automated decisions that can be defended.
of access requested in Spain in 2025; only 12 % (4.5 GW) granted
Preliminary Aelec data, via Forbes ↗of distribution nodes without capacity for new demand
Capacity maps, Sept 2025, via Forbes ↗CNMC deadline for Type 2 flexible-access tools
CNMC ↗Flexgy runs at the DSO, but it matters to everyone who depends on a flexible permit.
Without touching the grid, and with success and stop criteria agreed before starting.
We review your candidate nodes, engine and data.
Flexgy decides in parallel with real operations.
Deployment when the evidence justifies it.
Limit only what you must.
Not one megawatt of margin too many, nor one too few. And the proof of every decision.