Product · Evidence Passport

Every decision leaves its proof

The Evidence Passport lets you rebuild any decision months later: what was known, what was checked and why it acted, limited or abstained.

Passport viewer: context, inputs, versions, physics checks, decision and fingerprint. Illustrative screen with synthetic data.

Two decisions, two passports

Same node, same request. In the second case the grid is in a state the model has never seen, and Flexgy abstains.

Evidence Passport · Known state

FX-2026-000418
node
Example node · 45 kV
requested
20 MW
guaranteed firm
8 MW
engine candidate
14.2 MW
margin
calibrated P95
never-seen state
no
hash
9f3a 0c41 b7e2 5d18
ACT · 13.4 MW authorised

Evidence Passport · Never-seen heatwave

FX-2026-000419
node
Example node · 45 kV
requested
20 MW
guaranteed firm
8 MW
engine candidate
14.2 MW
temperature
41.2 °C · out of domain
never-seen state
yes
hash
c27d 81e0 4a96 f3b5
ABSTAIN · 11.9 MW verified by physics

Example with synthetic data. Illustrative values, not performance results.

What it records

Everything needed to rebuild the decision without relying on anyone’s memory.

Context
Node, affected permit, date and time, and horizon (real time or day-ahead).
Inputs
The engine’s candidate limit, the measurements and forecasts used, and the current topology.
Versions
Model, calibration and topology versions used for the decision.
Thresholds
Risk level applied (P50–P99) and the never-seen-state threshold.
Checks
Results of the physics checks: thermal, voltage and N-1.
Outcome
Act, limit or abstain, with the authorised megawatts and the cause.
Fingerprint
A hash of the record to detect any later alteration.

Who uses it

Operations

Reviews why a permit was limited and with which data, without redoing the calculation.

The permit holder

Can receive the part that concerns them: when, how much and why they were limited.

Regulation and audit

A basis for the annual CNMC report and for any later review.

Why it matters

The Spanish regulator’s (CNMC) resolution on flexible access permits requires every disconnection or reconnection instruction to be recorded completely and auditably, with date, time, duration, affected installations and cause (POD1, section 10). Since curtailments carry no compensation, the justification of each one is what gets disputed. The passport is designed to support that record.

CNMC resolution of 31/07/2026 (BOE, Spanish) ↗

Formats

  • JSON, to integrate into your systems and the annual report.
  • Readable PDF, for human review and case files.

What it is not

  • Not a compliance certificate: it is evidence that can support one.
  • It does not replace the DSO’s official record: it feeds it.

See a full passport in the demo.