Solutions · Connection applicants
A well-assured flexible permit is a permit that gets granted
If your project is waiting for capacity at a saturated node, flexible access may be the fastest route. Flexgy helps the DSO grant it with confidence and explain every curtailment.
Who it is for
Storage
Batteries in demand mode are always assessed as flexible access in Spain.
Data centres
Large loads that cannot wait years for a grid reinforcement.
EV charging
Charging hubs and fleets with predictable peaks.
Industry
Process electrification in industrial areas with saturated grids.
The context
of Spanish distribution nodes without capacity for new demand
Capacity maps, Sept 2025, via Forbes ↗compensation for curtailment: reductions of a flexible permit are not compensated
CNMC resolution of 31/07/2026 ↗Why the justification of each curtailment matters to you
- Your flexible permit can be limited preventively, without anything having failed.
- Since there is no compensation, the only thing you can dispute is whether the curtailment was justified and proportionate.
- The rules require every instruction to be recorded and available to the holder. With an Evidence Passport, that record also says why.
Where Flexgy fits
Flexgy works with the DSO, does not replace it, and does not broker permits. If your DSO uses Flexgy, every limit applied to you will be backed by a calibrated margin, a physics check and a passport stating the cause.
Read the flexible access guide →