Solutions · Connection applicants

A well-assured flexible permit is a permit that gets granted

If your project is waiting for capacity at a saturated node, flexible access may be the fastest route. Flexgy helps the DSO grant it with confidence and explain every curtailment.

Who it is for

Storage

Batteries in demand mode are always assessed as flexible access in Spain.

Data centres

Large loads that cannot wait years for a grid reinforcement.

EV charging

Charging hubs and fleets with predictable peaks.

Industry

Process electrification in industrial areas with saturated grids.

The context

83.4 %

of Spanish distribution nodes without capacity for new demand

Capacity maps, Sept 2025, via Forbes ↗
€0

compensation for curtailment: reductions of a flexible permit are not compensated

CNMC resolution of 31/07/2026 ↗

Why the justification of each curtailment matters to you

  • Your flexible permit can be limited preventively, without anything having failed.
  • Since there is no compensation, the only thing you can dispute is whether the curtailment was justified and proportionate.
  • The rules require every instruction to be recorded and available to the holder. With an Evidence Passport, that record also says why.

Where Flexgy fits

Flexgy works with the DSO, does not replace it, and does not broker permits. If your DSO uses Flexgy, every limit applied to you will be backed by a calibrated margin, a physics check and a passport stating the cause.

Read the flexible access guide →

Monthly newsletter · “Node by node”

Flexible access, the 2028 CNMC deadline and automated decisions, once a month.

First issue: the guide “What the CNMC requires before 2028, on one page”.

Do you have a project waiting for capacity?