Investment · pre-seed

An assurance layer for the grid that is coming

Flexgy is at pre-seed and in incorporation. We are looking for investors who understand critical infrastructure and want in before the first pilot.

Write to the team

Why now

1/1/2028

The Spanish regulator (CNMC) requires DSOs to have Type 2 flexible-access tools and to report annually on the use of those permits.

CNMC ↗
2/12/2027

Regulation (EU) 2026/1744 (Digital Omnibus on AI) moves the Annex III high-risk obligations, including critical infrastructure, to this date.

OJ EU ↗
83.4 %

of Spanish distribution nodes without capacity for new demand, according to published capacity maps (Sept 2025).

Forbes ↗

The thesis

The engines that compute limits already exist. What is missing is someone who says whether each recommendation is reliable enough to act on, and proves it.

Flexgy sits on top of any engine (vendor-agnostic): it calibrates the margin, detects never-seen states, abstains when confidence is missing and issues an Evidence Passport for every decision.

We start with flexible electricity access in Spain, with the same problem open across Europe.

Where we are

  1. Now

    Working prototype on synthetic data. Company in incorporation.

  2. 16/11/2026

    Kick-off of Naturgy’s Connecting Energy 2026, the programme we were selected for.

  3. Next

    Shadow-mode pilot with 1–3 DSOs.

  4. Then

    First licences and European expansion.

What we are looking for

A conversation with pre-seed investors and business angels with experience in energy, infrastructure or industrial software. The deck and plan are shared in that conversation.

We do not publish projections or market figures on the web: they are hypotheses we are validating, and we present them with their assumptions.