Pilot programme · limited places

Try Flexgy on your grid, without touching it

Flexgy decides in parallel with your real operations, alongside your existing grid engine and read-only. At the end you have the evidence to decide on deployment. Places are limited: we review each application against explicit criteria.

Apply for the pilot
Duration
12–16 weeks
Scope
1–3 nodes ≥ 30 kV
Control over the grid
None: read-only
Criteria
Success and stop criteria agreed before starting

How it runs

  1. Historical replay

    We replay past states of your nodes and compare decisions with what actually happened.

  2. Shadow mode

    Flexgy decides in parallel with real operations, without writing to any OT system.

  3. Evaluation

    We review the results with your engineers against the agreed metrics.

  4. Decision

    Continue, adjust or stop. You decide with the evidence in front of you.

What we need from the DSO

  • Historical data for 1–3 nodes (under NDA; requested in the briefing, not on the web).
  • One reference engineer.
  • A follow-up meeting every two weeks.

What you get

  • An Evidence Passport for every decision.
  • Metrics: false-safe decision rate, capacity utilisation, abstention rate, latency and calibration.
  • A draft of the annual CNMC report based on the pilot.

What it is not

It is not a deployment, it does not control the grid and it is not a compliance certificate. It is a proof of concept to decide with data.

Diagnostic → pilot → licence. Terms are discussed in the demo.

Apply for the pilot